Package B - 5kv Replacement Feeder 1

 

Package B involves the installation of new 5kv cables, transformers, switchgear, junctions, terminations, switches and conduit. The following buildings were upgraded during 2006.

Slater Hall – install new transformer, disconnect switch, conduit and cable. An outage will be required for terminations.

University Hall – relocate meter and rework feeder.

Rhode Island Hall – install new 5kv feeder. An outage will be required for terminations.

JW Wilson – install new 5kv feeder. An outage will be required for terminations.

Sayles Hallremove existing 11kv cable and replace with 5kv cable. An outage will be required for terminations.

Walter Hallinstall new transformer and disconnect switch.

Hunter Lab - install new 200 amp switch, transformer and cable. An outage will be required for the removal of existing transformer and installation of new along with terminations.

Plant Environmental Center - install new 5kv cable.

Metcalf Research, Metcalf Chem Arnold Lab - install cable, junctions and switches. An outage will be required for terminations.

In 2007 four transformers were installed at Arnold, Hunter Vault, Slater and Metcalf Chem.