Package E - Sharpe Refectory Rework of 5kv & 11kv Gear
Package E work involves the installation of 2 new transformers, 5kv Vista switch, (2) 11kv Vista switches, circuit breaker, and cables at the Sharpe Refectory substation. Several shutdowns were required for terminations. Work was completed in 2008.