skip navigation

This page is designed for modern browsers. You will have a better experience with a better browser.

Brown University Brown University Brown University CustomHome

Electrical Distribution Progress Photos

May 07 - August 08

Pulling telecommunication cable through Alumnae Hall Shipping old transformers off site Transformer replacement at Wriston Quad
Electrical equipment removal at Lyman Hall Transformer replacement at Wriston Quad Cable pulling along Angell St.
Removal of JWW generator Temp. generator for Watson Inst. outage Watson Inst. outage
Sharpe Refectory equipment rigging Load transfer at Sharpe Refectory Relocating Geo-Chem transformer
Cable splicing Feeder phasing in MacMillan Hall Rigging vista switch into Geo-Chem
Faculty Club outage Sharpe Refectory outage Vartan Gregorian Quad outage
Geo-Chem outage TF Greene outage Barbour Hall outage
180 George St. electrical outage Vista switch in Sharpe substation Testing new cable in MacMillan
Install new substation gear in Sharpe Refectory Conduit inspection on Brown St. ductbank Electrical preparation on Main Green
Rigging Electrical equipment into Watson CIT Cable Pulling Cable Pulling
Cable Pulling Cable Pulling on Waterman St. Rigging Vista switch into JWW
Cable splicing along Waterman St. Pulling cable in Lot 44 Sharpe Substation Vista switch
 Conduit Clearing Pulling Cable Conduit Clearing

Installing equipment into John Hay Library vault JWW substation transformer installation Energized equipment in JWW substation (Nightwork)

Rigging transformer onto South Mezzanine Electrical equipment on South Mezzanine Electrical equipment on South Mezzanine
Rigging equipment Sharpe Substation Pulling cable on Bowen St. Rigging equipment into Pembroke #3
Sharpe Refectory Substation Pulling cable into Pembroke #3 Conduit installation Slater utility tunnel